Elevating Your Prefabrication Capabilities Beyond BIM

Time: 11:30 am
day: Day Two

Details:

  • Methods electrical contractor use can expand their prefabrication abilities regardless of company size, prefab experience & BIM capabilities
  • Sifting through Design Models to keep the useful information for construction and discard the information that is not needed
  • How can you prepare for the future of prefabrication beyond BIM?

Speakers: