Evaluating the Uses of the Model Across the Production Cycle to Ensure the Right Information is Included in the Right Format for Each User
Time: 2:20 pm
day: Day One
Details:
• Assessing the limitations of BIM software to incorporate the level of detail required by electrical contractors
• Balancing the investment of time and money in building a robust model for prefabrication with efficiency and ease of use
• Utilizing templates and standardized formats to expedite model production and reduce errors
• Exploring ways to supplement model data with additional details required by the facility and field to support production and installation