Case Study: Discovering Best Practices for Modeling Conduit to Improve Prefab Compatibility & Seamless Construction Integration

Time: 1:10 pm
day: Day Two Track A Pm

Details:

  • Ensuring conduit layouts and materials are compatible with prefab requirements
  • Exploring the importance of early-stage coordination with project stakeholders to ensure material types and installation constraints (e.g. racks, supports) are included in the modeling process
  • Showcasing best practices for laying out conduit in Revit, including how to model with precise spacing, to ensure they are fully constructible

Speakers: