Case Study: Conducting Time & Cost Studies for Electrical Materials & Products to Discover Opportunities for Increased Production Efficiency & Savings

Time: 8:50 am
day: Day Two AM

Details:

  • Analyzing the financial impact of prefabrication by comparing material costs and time savings between shop production and field installation
  • Developing accurate unit prices based on labor and material costs to improve assembly estimate accuracy 
  • Addressing the frustrations of tracking labor at each stage of prefabrication with more streamlined approaches

Speakers: