Case Study: Conducting Time & Cost Studies for Electrical Materials & Products to Discover Opportunities for Increased Production Efficiency & Savings

Time: 9:30 am
day: Day Two AM

Details:

  • Aligning design for install (DFI), virtual design and construction (VDC) and design for manufacturing and assembly (DFMA) with field needs from the outset to ensure effective prefab execution
  • Establishing lean manufacturing flows and one-piece kitting strategies to minimize waste, streamline processes and ensure consistent installation outcomes
  • Building a connected, well-managed supply chain that sustains prefab operations and ensures reliable, on-time value delivery across projects

Speakers: